Skip to content

How The Proposal Has Developed

This page sets out how the proposal for the plant has developed in conversation with the people of Ballymahon, from the first concept plan to the current layout. Every statement is drawn from documents supplied by Nephin Renewable Gas Ballymulvey Limited, and the record of the Listening Rooms will be added here after the event.

How Local Views Have Shaped The Proposal

Nephin Renewable Gas Ballymulvey Limited's design for the plant has already changed in response to local views. Before the charter process began, comments from near neighbours and from others in the area led Nephin Renewable Gas Ballymulvey Limited to revise its initial drawings, and the changes made as a result are set out below. Because these changes arose from conversations with individual neighbours, they have not until now been recorded publicly; this section gives them a place alongside the suggestions which the Listening Rooms will add.

  1. A concept plan shared for discussion

    Nephin Renewable Gas Ballymulvey Limited presented its first concept plan to the shareholders of Longford Westmeath Farmers Mart at their annual general meeting, as a discussion document rather than a fixed design.

  2. A first conversation with a near neighbour

    Nephin Renewable Gas Ballymulvey Limited met a directly affected neighbouring household to walk through the early design and to listen to their advice.

  3. Early 2026

    Early feedback from local representatives

    Members of the development committee and local representatives identified the historic landfill beside the site as a particular concern for the area.

  4. Conversations with local councillors

    Nephin Renewable Gas Ballymulvey Limited spoke with councillors for the Ballymahon area about the proposal and the questions their constituents were raising.

  5. The plant moved in response to local feedback

    In response to concerns raised by local people, Nephin Renewable Gas Ballymulvey Limited moved the plant approximately 60 metres to the south-west of the position shown in the concept plan, to maximise the separation distance from the historic landfill boundary and to minimise disturbance to the watercourses, both of which lie to the east of the site. The change is recorded in the amended site layout plan of October 2026.

  6. October and November 2026

    Calling to neighbouring homes

    Nephin Renewable Gas Ballymulvey Limited called door to door to the homes nearest the site, leaving a letter of information at each and speaking with those who were at home.

  7. Upcoming:

    A second round of information

    A further letter, with an invitation to the Listening Rooms, goes to neighbouring homes and to everyone who has engaged so far.

  8. Upcoming:

    The Listening Rooms

    The first community event of the charter process, at which every suggestion is recorded and answered on this site.

How local views have shaped the proposal so far, and what comes next.

The Drawings, Before And After

Nephin Renewable Gas Ballymulvey Limited has amended its drawings in response to what it has heard. The first concept plan and the current layout are shown side by side below, so that anyone can see where the plant has moved and what has changed. Both drawings are set on the same surveyed reference points, and comparing them shows that the plant now sits approximately 60 metres to the south-west of its position in the concept plan, a change Nephin Renewable Gas Ballymulvey Limited made to maximise the separation distance from the historic landfill boundary and to minimise disturbance to the watercourses, both of which lie to the east of the site.

Concept plan drawing by Nephin Renewable Gas Ballymulvey Limited, dated 7 October 2025, showing the proposed plant layout over an aerial photograph of the site at Ballymulvey, Ballymahon
The concept plan, October 2025, as presented to the shareholders of Longford Westmeath Farmers Mart.
Site layout plan by Nephin Renewable Gas Ballymulvey Limited, dated October 2026, showing the amended plant layout, approximately 60 metres to the south-west of its position in the concept plan, over an aerial photograph of the site at Ballymulvey, Ballymahon
The current site layout, October 2026.

The Listening Rooms: The Record

A record of the Listening Rooms on Friday 4 December 2026, listing the topics raised, the suggestions made and the date by which each question will be answered, will be published here within 10 working days of the event, together with photographs taken with the consent of anyone shown in them.

Next: The Community Fund

Supported By Lived Experience Captured In Literature